标题:Geological Disaster Survey and Treatment Strategies of Yingwanzhen Subway Station, Changsha
作者:张辰光*,查道函,周红霞,唐相伟,刘奎松,包峻帆,张勇,胡海丰,江海东
来源出版物:IOP Conf. Series: Earth and Environmental Science,2019, Vol. 371
DOI:10.1088/1755-1315/371/3/032030
出版年: 2019
文献类型:Article
语种:英文
摘要:In order to solve such problems as ground subsidence, water and mud bursting and shield machine foundering in subway construction which are caused by water-rich karst geological conditions, complete technological process is established to detect and treat karst in urban areas. The occurrence of natural electric field frequency selection method and groundwater determine groundwater occurrence vector that karst and fault fracture zone, and make use of the grouting technology of karst fracture with the treatment. The construction of Yingwanzhen Stationon Changsha Metro Line No. 4 provesthe favorable effect of the detection technology and treatment measures, which provides experience and reference for the construction of Changsha subway and underground engineeringin other cities with water-rich karst areas.
关键词:Karst disaster, Grouting, Subway, Yingwanzhen of Changsha
论文连接: https://iopscience.iop.org/article/10.1088/1755-1315/371/3/032030